Awarded as Top 10 Crane Manufacturer 2021 By Industry Outlook

Things Project Engineer Should ensure before installation of Cranes

Things Project Engineer Should ensure before installation of Cranes

April 29, 2019
Things Project Engineer Should ensure before installation of Cranes at Site
  1.  Leveling of Gantry Girders has been done as per BS:466-1984.
  2.  Access to Crane installation site for EOT Crane and Mobile Crane.
  3.  Flooring of Shed complete for shifting Erection of EOT Crane.
  4.  3 Phase Earth 415V, 50 Hz Power Supply available at site for Erection and Load Testing of Crane.
Call Our Experts